TITLE:Water Suply – Water Treatment Plant for potable water from artificial lake of Pineios
NAME OF CLIENT:Municipality of Amaliada
TYPE OF SERVICES PROVIDED:Preparation of Bid Project in Final Design phase for the consortium and then preparation of the Application Study.
NAME OF LEGAL ENTITY:HYDROMENT ENGINEERING CONSULTANTS S.A.
PROJECT CONSTRUCTION CONTRACTOR:JOINT VENTURE “MESOGEIOS S.A. – EGNON S.A. – AAGIS S.A.”
DATES (START):2008
DATES (END):2009
PLACE:Pinios Lake, Municipality of Amaliada
DETAILED DESCRIPTION OF PROJECT:Drinking water treatment plant Design from the artificial lake of Pinios in the prefecture of Ilia.
The project starts from the water intake project and ends at the predicted position where the clean water outlet networks are connected to the distribution networks.
Installation briefly consists of the following units:
– Hydrant Project – water supply pipeline
– Entry Well
– Ozonation unit
– pH correction unit
– Rapid mixing
– Flocculation
– Precipitation
– Refining Unit
– Disinfection with chlorine gas
– Treated water storage tank
– Infrastructure for storaging and dosing of chemicals (aluminum sulphate, polyelectrolyte, sulfuric acid and sodium hydroxide)
– Sludge treatment plant (pumping sludge thickening tank, sludge dewatering unit).
– Wash waters Unit
OVERALL PROJECT VALUE (EUR):11.700.000,00 € with revision and tax.
ORIGIN OF FUNDING:Public Investments Program