| TITLE: | Internal Network Reconstruction Study, Wastewater Adduction Works and Wastewater Treatment Plant (WWTP) of St. George Settlement | 
| NAME OF CLIENT: | Municipality of Livadia | 
| TYPE OF SERVICES PROVIDED: | Plumbing & E / M Preliminary Wastewater Networks Study, Preliminary WWTP Study (Hydraulic, E / M, Chemotechnical), Final Wastewater Networks Hydraulic Study | 
| NAME OF LEGAL ENTITY: | HYDROMENT – ENGINEERING CONSULTANTS S.A. | 
| PROJECT CONSTRUCTION CONTRACTOR: | |
| DATES (START): | 2014 | 
| DATES (END): | 2015 | 
| PLACE: | Municipality of Livadia, Viotia Prefecture | 
| DETAILED DESCRIPTION OF PROJECT: | Part 1: Internal Sewerage Network and Supply Pipe The proposed internal sewer network for St. George settlement, has a total gravity pipe length of about 16,4 km. Part 2: Wastewater Treatment Plant  | 