TITLE:Preliminary Study for the project Installation of Wastewater Treatment Plant of Orfanos Municipal Unity of the Municipality of Pagaio, External Networks and Disposal of treated Wastewater
NAME OF CLIENT:Municipality of Paggaio
TYPE OF SERVICES PROVIDED:Preliminart Study for the WWTP supply network and the required Pumping Stations and the WWTP
NAME OF LEGAL ENTITY:ALKOPLAN MELETITIKI L.P.
DATES (START):2012
DATES (END):2015
PLACE:Municipality of Paggaio, Prefecture of Kavala
DETAILED DESCRIPTION OF PROJECT:Adduction Works
With the proposed works, wastewater will gravitationally / under pressure move from “Ofrynio” settlement to the WWTP, while wastewate from “Ofrynio Beach” and “Karyani” settlements will the settlements’ Beach Ofryniou “and” Karyani “wastewater will be led to the WWTP.

Waste Water Treatment Plant
The WWTP was designed for population equivalent to: Phase A – 12,600 and Phase B – 18.900 with peak loads of 266.47 and 383,58 m3 / hr respectively. The selected method of treatment is the Extended Aeration Activated Sludge System with simultaneous Nitrogen removal.